fidbox Logo
Kontakt und Impressum Jilg Parkett externer Link Home
electronic monitoring system
fidbox News Haftungsprobleme Parkett ..und Lšsungen Wem nŸtzt die fidbox? Forschung und Entwicklung Verlegeanleitung Download Infomaterial
   

Liability problems with parquet complaints …

Product development, quality assurance and the release of technical leaflets result from the basis provided from standardised test results and standardised conditions.

In the event of a complaint or should discrepancies or should faults occur, without the fidbox concrete long-term data about the actual environmental conditions at the time of installation respectively during the continuous use will be missing.

Without the fidbox, it remains unclear, whether:

  • The screed was flawlessly ready for installation
  • Residual moisture from the concrete slab or floor filling occurred
  • The room-climatic conditions were continuously in accordance with the set standards
  • Too high surface temperature occurred at the floor level due to underfloor heating

Without a sufficient data basis, no liability question can be properly and fairly clarified. Thanks to the fidbox the time of the evidence-incapable assumptions is over and the time of effective security has began.

fidbox – with security into the future

 
 
© Helmut Jilg, Jilg Ges.m.b.H 2008 | Gestaltung: d.sign Gruber & Partner KG